2. Cooling tower installation
In the event cooling tower(s) is to be installed at the school, the principal and/or their delegate must ensure that the cooling tower(s) is installed and positioned so that competent persons (such as qualified contractors) conducting the testing and maintenance can easily and safely access all parts of the cooling tower.
Chapter 2 of the Cooling Towers Procedure on safe installation of cooling towers in schools
Reviewed 06 September 2022